For systems with low tolerance for downtime, we design, build and regularly test high-availability and disaster-recovery architectures around your business targets.
01Problems we solve
What organisations most often face in this area.
- P.01
Undefined targets
How much data loss and downtime is acceptable (RPO/RTO) has never been agreed with the business.
- P.02
Built but never rehearsed
The architecture exists, but failover and failback have never been tried and the procedure is not written.
- P.03
Missed dependencies
Logins, jobs, connection strings and application settings are missing on the secondary.
- P.04
Synchronisation lag
Replica or log shipping lag is not monitored; an incident could lose more data than expected.
02Reference architecture
Two sites, defined failover, rehearsed failback.
The architecture chosen for your targets is built together with documented runbooks. The drawing shows a typical design; each organisation's version follows its RPO/RTO targets.
Illustrative example — not real client data
Primary data centre
Windows Server Failover Cluster
Disaster recovery site
PostgreSQL equivalent
DR test flow
- 01Preparation and communication
- 02Planned failover
- 03Application validation
- 04Failback
- 05Record of actual RPO/RTO
03Our approach
How we work.
01
Set targets
Systems are classified by criticality; RPO and RTO targets are agreed with the business for each.
02
Architecture design
The right technology is chosen for the targets: Always On, Windows Server Failover Cluster, log shipping or replication.
03
Build and runbook
The architecture is built; failover, failback and validation steps become executable procedures.
04
Regular DR tests
Disaster scenarios are rehearsed on schedule; actual times are compared with targets.
04Technical scope
Engineering depth.
High availability
- Always On Availability Groups
- Windows Server Failover Cluster
- Failover Cluster Instances
- PostgreSQL streaming replication and automatic failover
Disaster recovery
- Log shipping
- Replication
- Remote site architecture
- Restore-based recovery strategy
Verification
- RPO / RTO assessment
- DR plan and runbook
- Scheduled DR tests
- Synchronisation lag monitoring
05Value to the organisation
What changes for management.
Proven continuity
Disaster recovery is a rehearsed, timed capability, not a document.
Known risk
Management knows how long each system takes to return and how much data it could lose.
Audit readiness
Test records and procedures are ready for continuity requirements.